Construction Update: 12-19-13

Week of December 22nd

Project Activities: Impact:

PE Complex

  • Pool Area work
  • Installation of footings for fence posts
  • Shut off water to east side of Campus for water tie-in
  • Sidewalk demolition at Parking Lot J
  • Delivery trucks/ increased traffic
  • Partial closure of Campus Drive
  • No access to soccer field
  • Loss of 7 parking spaces at Lot J
  • Construction  noise at Aquatics Center
 Parking Lot D & E
  • Striping parking lot D & E
  • Parking Lot  E will be closed Dec 23 &24
  • Parking Lot D visitor stalls will be closed Dec 23 & 24

Circuit C Project

  • Shutdown Circuit C for 2-4 hours

  • No power at CHS and east wing of LADM's lab during the holiday break
New Science Building
  • Construction Starts
  • Parking Lot F and ADA ramp are closed for construction until July 2015
OE2 Building
  • Pre-Construction activities
  • Contractor Mobilization
  • Temporary non-accessible pedestrian walkway from Lot I to Lot H
  • Bookstore deliveries will be coordinated with M&O

Week of December 29th

Project Activities: Impact:

PE Complex

  • Pool Area work
  • Connection to Sewer line at Campus Drive. Campus drive will be partially closed for two days
  • Utility trenching at sidewalk at Parking Lot J
  • Delivery trucks/ increased traffic
  • Partial closure of Campus Drive
  • No access to soccer field
  • Loss of 7 parking spaces at Lot J
  • Construction  noise at Aquatics Center
New Science Building
  • Contractor mobilization
  • Parking Lot F and ADA ramp are closed for construction until July 2015
  • Construction fence installation
OE2 Building
  • Pre-Construction activities
  • Contractor Mobilization
  • Temporary non-accessible pedestrian walkway from Lot I to Lot H
  • Bookstore deliveries will be coordinated with M&O

Week of January 5th

Project Activities: Impact:

PE Complex

  • Pool Area work
  • Concrete sidewalks (within fence line)
  • Sidewalk construction at Parking Lot J
  • Delivery trucks/ increased traffic
  • Partial closure of Campus Drive
  • No access to soccer field
  • Loss of 7 parking spaces at Lot J
  • Construction  noise at Aquatics Center
New Science Building
  • Contractor mobilization
  • Parking Lot F and ADA ramp are closed for construction until July 2015
  • Construction fence installed
OE2 Building
  • Pre-Construction activities
  • Contractor Mobilization
  • Temporary non-accessible pedestrian walkway from Lot I to Lot H
  • Bookstore deliveries will be coordinated with M&O