We will make every effort to assure the accuracy and completeness of these updates; however, there will be some changes and adjustments as construction progresses.

How Will Construction Activity Affect You?

  • Construction personnel and equipment will be on campus drive periodically throughout construction. Please proceed with caution.
  • With construction activity on-going safety is always a major priority for both staff and students. With this in mind we wanted to again ensure that both staff and students remain outside of the construction activity areas that have been established. These areas are clearly donated with temporary fencing. If access is needed within any construction areas proper notification, escort and safety measures (hard hats, vests, etc.) are required.
  • Campus Drive open.
  • Parking lots open: CDC, A1, A, B, C, D, E (west ¾), F, G, gym lot H, I, Aquatic Center, and overflow.
  • Parking lots closed: East ¼ of parking lot E.
  • East entrance right turn lane exiting Campus Drive will be closed during work hours due to work for electronic marque. Please proceed with caution.
  • Work will be on-going in and around the M&O yard. Please proceed with caution.
  • Minor work on the exterior precast panels on the Learning Resource Center (LRC) will be taking place. Full safety measures will be exercised during this operation.
  • Water to the LADM & CHS buildings will be shutdown 12/3 & 12/4 to re-route an existing water line. Water is scheduled to be turned back on by 12/5.

Week of December 5th

Parking, ADA Access & Lighting Improvements (PAL)

Campus wide

  • Trenching, forming and pouring of light pole bases and electrical wiring

M&O Access Road and Yard 

  • Asphalt berm installation 
  • Repair of exterior M&O yard fencing 
  • Electrical equipment enclosure preparation

Lot A – Parking Lot A 

  • Punch list work

Lot B – Parking Lot B

  • Punch list work

Lot C – Parking Lot C

  • Punch list work

Lot D – Parking Lot D

  • Punch list work

Lot E – Parking Lot E

  • Forming and pouring for ADA pathway/walkway
  • Excavation for wall & stair footings

Lot F – Parking Lot F

  • Punch list work

Lot G – Parking Lot G

  • Punch list work

Lot H – Parking lot H

  • Punch list work

Lot I – Parking lot I

  • Punch list work

Gym Parking lot

  • Punch list work

Campus Drive

  • West entrance island work
  • East entrance electronic marque work

Math and Science Annex (MSA)

  • Math Modular buildings: no work scheduled
  • Science Modular buildings: no work scheduled

Old Library Demolition

Data Relocation

  • No work scheduled

Library Demolition

  • Punch list work
  • Staining of concrete panels

CRF LEED Landscaping

  • No work scheduled

Learning Resource Center

  • Minor work on the exterior precast panels

Week of December 12th

Parking, ADA Access & Lighting Improvements (PAL)

Campus wide

  • Trenching, forming and pouring of light pole bases and electrical wiring

M&O Access Road and Yard

  • Electrical equipment enclosure preparation
  • Repair of exterior M&O yard fencing

Lot A – Parking Lot A

  • Punch list work

Lot B – Parking Lot B

  • Punch list work

Lot C – Parking Lot C

  • Punch list work

Lot D – Parking Lot D

  • Punch list work

Lot E – Parking Lot E

  • Forming and pouring for ADA pathway/walkway
  • Excavation and forming for wall & stair footings

Lot F – Parking Lot F

  • Punch list work

Lot G – Parking Lot G

  • Punch list work

Lot H – Parking lot H

  • Punch list work

Lot I – Parking lot I

  • Punch list work

Gym Parking lot

  • Punch list work

Campus Drive

  • East entrance electronic marque work

Math and Science Annex (MSA)

  • Math Modular buildings: no work scheduled
  • Science Modular buildings: autoclave delivery

Old Library Demolition

Data Relocation

  • No work scheduled

Library Demolition

  • Punch list work
  • Staining of concrete panels

CRF LEED Landscaping

  • Bike rack installation

Learning Resource Center

  • No work scheduled