We will make every effort to assure the accuracy and completeness of these updates; however, there will be some changes and adjustments as construction progresses.

How Will Construction Activity Affect You?

  • Construction personnel and equipment will be on campus drive periodically throughout construction. Please proceed with caution.
  • With construction activity on-going safety is always a major priority for both staff and students. With this in mind we wanted to again ensure that both staff and students remain outside of the construction activity areas that have been established. These areas are clearly donated with temporary fencing. If access is needed within any construction areas proper notification, escort and safety measures (hard hats, vests, etc.) are required.
  • Majority of Campus Drive is open. Portion of Campus Drive (from parking lot I to apex of East Campus Drive) will be closed from 10/31/11 through 11/8/11.
  • Parking lots open: CDC, A1, A, B, C, D, F, G, H, I, gym lot, and overflow.
  • Parking lots closed: E and Aquatic Center.
  • East entrance will remain open, but access to campus from east entrance will be via fire access road. Please proceed with caution.
  • Alternate parking for the Aquatics Center will be in parking lot I, see attached map for parking and pedestrian access information.
  • Vehicular access to parking lot’s F, G, H & I will be via the west portion of Campus Drive.
  • OE-1 stairs are closed. Revised tentative date for opening OE-1 stairs is 11/7/11.
  • Temporary fencing around old library demolition project site is in-place. West-half of the main quad and pathways/walkways directly north and south of the old library will be closed.
  • Parking spaces will be impacted up at the Aquatic Center parking lot periodically with the on-going CRF landscaping project. Areas will be sectioned off and kept to a minimum.
  • Minor work on the exterior precast panels on the Learning Resource Center (LRC) will be taking place over the next couple of weeks. Full safety measures will be exercised during this operation to ensure the safety of the staff and students.

Week of October 31st

Parking, ADA Access & Lighting Improvements (PAL)

Campus wide
  • Trenching, forming and pouring of light pole bases and electrical wiring
Lot A – Parking Lot A
  • Punch list work
Lot B – Parking Lot B
  • Punch list work
Lot C – Parking Lot C
  • Punch list work
Lot D – Parking Lot D
  • No work scheduled
Lot E – Parking Lot E
  • Forming and pouring for ADA pathway/walkway
  • Landscape installation
Lot F – Parking Lot F
  • Punch list work
Lot G – Parking Lot G
  • Punch list work
  • OE-1 Stairs: handrail installation
Lot H – Parking lot H
  • Punch list work
Lot I – Parking lot I
  • Punch list work
Gym Parking lot
  • Handrail installation
  • Landscape installation
Campus Drive
  • Portion of Campus Drive (from parking lot I to apex of East Campus Drive) will be closed from 10/31/11 through 11/8/11. See above for further details on shutdown.

Math and Science Annex (MSA)

  • Math Modular buildings: no work scheduled
  • Science Modular buildings: no work scheduled

Old Library Demolition

Data Relocation
  • No work scheduled
Library Demolition
  • Site work (concrete pavement, irrigation & landscape)

CRF LEED Landscaping

  • Planting
  • Punch list

Learning Resource Center

  • Minor work on the exterior precast panels

Week of November 7th

Parking, ADA Access & Lighting Improvements (PAL)

Campus wide
  • Trenching, forming and pouring of light pole bases and electrical wiring
M&O Access Road and Yard
  • Electrical equipment enclosure preparation
  • Hydroseed slope
  • Subgrade preparation, aggregate base and asphalt pavement placement
  • Repair of exterior M&O yard fencing
Lot A – Parking Lot A
  • Punch list work
Lot B – Parking Lot B
  • Punch list work
Lot C – Parking Lot C
  • Punch list work
Lot D – Parking Lot D
  • Parking lot D will be shutdown November 11th, 12th & 13th (Veteran’s Day 3-day weekend) for slurry & striping.
Lot E – Parking Lot E
  • Forming and pouring for ADA pathway/walkway
  • Excavation for stair footings
Lot F – Parking Lot F
  • Punch list work
Lot G – Parking Lot G
  • Punch list work
Lot H – Parking lot H
  • Punch list work
Lot I – Parking lot I
  • Punch list work
Gym Parking lot
  • Punch list work
Campus Drive
  • Portion of Campus Drive (from parking lot I to apex of East Campus Drive) will be closed from 10/31/11 through 11/8/11. See above for further details on shutdown.
  • All of Campus Drive will be shutdown November 11th, 12th & 13th (Veteran’s Day 3-day weekend) for slurry & striping.
  • West entrance island modifications
  • East entrance electronic marque work

Math and Science Annex (MSA)

  • Math Modular buildings: no work scheduled
  • Science Modular buildings: no work scheduled

Old Library Demolition

Data Relocation
  • No work scheduled
  • Delivery and installation of transfer switch
Library Demolition
  • Punch list work

CRF LEED Landscaping

  • Punch list
  • Bike rack installation

Learning Resource Center

  • Minor work on the exterior precast panels