Construction Update 6/13/2013

Week of June 17th

Project Activities: Impact:

Electrical Reroute:

  • Cable and equipment installation
  • Electrical shutdown/connection
  • Phone/data shutdown
Projected Completion Date: June 30th, 2013
  • Pedestrians will be detoured to/from the LRC and the 1st floor of the CHS building. Zoom in on the attached map for pedestrian detours.
  • There will be minimal construction noise.
  • Sidewalks reopened on June 18th
  • Electrical shutdown scheduled for Thursday, June 20th (6pm) –Sunday, June 23rd (will affect PAC, SSA, Cafeteria, SSB, CDC, and LRC)
  • Electrical shutdown on Saturday, June 22rd (will affect CHS and LADM Physics and Anatomy labs). Coordination with affected areas is in process.
  • Phone/data shutdown scheduled for Saturday, June 22nd (will affect CHS)

OE2 Demo

  • Install construction fencing and signage, walkways, etc.
  • Underground site utility investigation
  • Once construction fencing is installed it will detour pedestrians by alternate route to/from Lot I.

OE1 Roofing Project

  • Mobilization and temporary fencing up around OE1

Projected Completion Date: July 15th, 2013

  • Due to the shutdown of the building ventilation, OE1 building will be closed for the duration of the project.

SSB 1st Floor Painting and Flooring Project

  • Install flooring (complete 6/17/13)
  • CHC Maintenance 6/17 -6/20
  • Move-in begins

Projected completion date: June 27, 2013

  • HWC temporarily located at the Gym
  • DSPS temporarily located in the LRC

Week of June 24th

Project Activities: Impact:

Electrical Reroute:

  • Punch list and cleanup
  • Shut-down weekend June 28th and June 29th

Projected Completion Date: June 30th, 2013

  • Pedestrians will be detoured to/from the LRC. See fencing map for pedestrian detours.
  • Partial campus electrical outage (More information to follow)

OE2 Demo

  • Continue installation fencing, signage, walkways, etc.
  • Irrigation relocation
  • Underground site utility demolition
  • Once construction fencing is installed it will detour pedestrians by alternate route to/from Lot I.

OE1 Roofing Project

  • Remove existing roofing
  • Install new roof

Projected Completion Date: July 15th, 2013

  • Due to the shutdown of the building ventilation, OE1 building will be closed for the duration of the project.
  • There will be minimal construction noise during removal and disposal of existing roofing material.
  • There will be a tar smell from the site during hot asphalt placement.

SSB 1st Floor Painting and Flooring Project

  • Re-install furniture and set up areas

Projected completion date: June 27, 2013

  • HWC and DSPS moved back into SSB

Week of July 1st

Project Activities: Impact:

OE2 Move Out and Demo

  • Irrigation relocation
  • Underground site utility demolition
  • Begin activity within building: soft demolition, hazardous material abatement, etc.
  • Once construction fencing is installed it will detour pedestrians by alternate route to/from Lot I.

OE1 Roofing Project

  • Remove existing roofing
  • Install new roof

Projected Completion Date: July 15th, 2013

  • Due to the shutdown of the building ventilation, OE1 building will be closed for the duration of the project.
  • There will be minimal construction noise during removal and disposal of existing roofing material.
  • There will be a tar smell from the project during hot asphalt placement.

SSB 1st Floor Painting and Flooring Project

  • Complete