Crafton Hills College Construction Update 5/30/11:

We will make every effort to assure the accuracy and completeness of these updates; however, there will be some changes and adjustments as construction progresses.

HOW WILL CONSTRUCTION ACTIVITY AFFECT YOU?

  • Construction personnel and equipment will be on campus drive periodically throughout construction. Please proceed with caution.
  • Beginning Tuesday, May 31st through June 24th,the following parking lots will be closed to staff, students, and the public: overflow parking lot, parking lot B, parking lot C, parking lot F, parking lot G, parking lot H, and parking lot I. For those needing access to the west side of campus CDC parking lot, parking lot A1, and parking lot A will be open and available for use. For those needing access to the east side of campus parking lot E and Aquatic Center parking lot will be open and available for use. For the start of summer school, June 27th, majority of these lots will be opened up and available for use, but the following lots will remain closed: parking lot F, parking lot G, and parking lot I.
  • Beginning Tuesday, May 31st through June 24th,the west entrance and west half, up to parking lot D, of Campus Drive will be closed. The only access to the CHC campus will be via the east entrance of Campus Drive. Temporary access to the Child Development Center (CDC), CDC parking lot, parking lot A1, parking lot A, and the M&O yard will be via the fire access road behind the PAC from the east entrance. The two double gates will remain open at all times. Also, parking lot D will be used as the turnaround for those that come into the middle of campus. For the start of summer school, June 27th, the west entrance and west half of Campus Drive will be opened up and available for use.
  • Beginning Tuesday, May 31st through June 24th, the pedestrian pathway/walkway from the Science Complex to the OE Complex and Gym will be closed. For the start of summer school, June 27th, this pedestrian pathway/walkway will be open and available for use.
  • Tree demolition will be taking place throughout the campus (majority of work will be in and around parking lots). While this operation is taking place a few parking stalls will be closed down from time to time. Full safety measures will be exercised for this operation. Please proceed with caution.
  • Access to the tennis courts is from the south gates.
  • Access to soccer field is routed via the walkway south and west of the tennis courts. This route will continue for the duration of the MSA project.
  • Parking spaces/stalls on campus drive adjacent to the MSA project site are closed to staff and students.
  • Modular buildings segments for the Math and Science Annex have begun to be delivered to the CHC campus. They will be temporarily located in the overflow parking lot, which is currently closed to staff and students. The remainder of the modular buildings segments will be delivered over the course of the next several weeks with all segments being on-site by the beginning of June. Beginning the week of May 23rd the modular building segments will start to be installed at the MSA project site. Large hauling equipment will be used in this operation and be on campus drive periodically. Full safety measures will be exercised for this operation. Please proceed with caution.
  • Work in and around manholes throughout campus will be ongoing for the data relocation portion of the library demolition project. Full safety measures will be exercised for this operation. Please proceed with caution.
  • Work in future IDF data room on the lower level of the LADM is ongoing. Work with extreme noise levels will be coordinated with CHC campus operations in an effort to minimize disruption.

Week of May 30th

Parking, ADA Access & Lighting Improvements (PAL)

Campus wide

  • Tree demolition
  • Clear & grub
  • Trenching, forming and pouring of light pole bases and electrical wiring

Lot A – Parking Lot A

  • Punch list work
  • Electrical enclosure waterproofing

Lot B – Parking Lot B

  • Punch list work

Lot C – Parking Lot C

  • Slurry & striping
  • Form & pour flatwork
  • Landscape installation

Lot F – Parking Lot F

  • PARKING LOT F WILL BE CLOSED TO STAFF, STUDENTS AND PUBLIC BEGINNING TUESDAY, MAY 31ST
  • Temporary fencing installation
  • Pre-construction staking and surveying
  • Clear & grub
  • Demolition

Lot G – Parking Lot G

  • PARKING LOT G WILL BE CLOSED TO STAFF, STUDENTS AND PUBLIC BEGINNING TUESDAY, MAY 31ST
  • Temporary fencing installation
  • Pre-construction staking and surveying
  • Clear & grub
  • Demolition

Lot H – Parking lot H

  • Slurry & striping
  • Form & pour flatwork
  • Landscape installation

Lot I – Parking lot I

  • PARKING LOT I WILL BE CLOSED TO STAFF, STUDENTS AND PUBLIC BEGINNING TUESDAY, MAY 31ST
  • Temporary fencing installation
  • Pre-construction staking and surveying
  • Clear & grub
  • Demolition

Pedestrian Pathway/Walkway between Science Complex & OE Complex & Gym

  • PEDESTRIAN PATHWAY/WALKWAY BEWTEEN SCIENCE COMPLEX & OE COMPLEX & GYM WILL BE CLOSED TO STAFF, STUDENTS AND PUBLIC BEGINNING TUESDAY, MAY 31ST
  • Temporary fencing installation
  • Pre-construction staking and surveying
  • Clear & grub
  • Demolition

Campus Drive

  • THE WEST ENTRANCE AND WEST HALF, UP TO PARKING LOT D, WILL BE CLOSED TO STAFF, STUDENTS AND PUBLIC BEGINNING TUESDAY, MAY 31ST
  • Temporary fencing installation
  • Pre-construction staking and surveying
  • Clear & grub
  • Demolition

Math and Science Annex (MSA)

  • Trenching and installation for underground building utilities
  • Modular building fabrication
  • Modular building segments being delivered to CHC campus over the course of the next several weeks
  • Exterior and interior work on-going with math modular classroom buildings

Old Library Demolition

Data Relocation

  • Contractor will be working in and around various manholes throughout campus
  • Contractor will be working in the basement of the old library and various IDFs throughout campus
  • LADM & LRC IDF room preparation and work

Week of June 6th

Parking, ADA Access & Lighting Improvements (PAL)

Campus wide

  • Tree demolition
  • Clear & grub
  • Trenching, forming and pouring of light pole bases and electrical wiring

Lot A – Parking Lot A

  • Punch list work

Lot B – Parking Lot B

  • Punch list work

Lot C – Parking Lot C

  • Form & pour flatwork
  • Landscape installation

Lot F – Parking Lot F

  • Clear & grub
  • Demolition

Lot G – Parking Lot G

  • Clear & grub
  • Demolition

Lot H – Parking lot H

  • Form & pour flatwork
  • Landscape installation

Lot I – Parking lot I

  • Clear & grub
  • Demolition

Pedestrian Pathway/Walkway between Science Complex & OE Complex & Gym

  • Clear & grub
  • Demolition

Campus Drive

  • Clear & grub
  • Demolition

Math and Science Annex (MSA)

  • Trenching and installation for underground building utilities
  • Modular building fabrication
  • Modular building segments being delivered to CHC campus over the course of the next several weeks
  • Exterior and interior work on-going with math modular classroom buildings

Old Library Demolition

Data Relocation

  • Contractor will be working in and around various manholes throughout campus
  • Contractor will be working in the basement of the old library and various IDFs throughout campus
  • LADM & LRC IDF room preparation and work