  • Parking Lots A & B are closed to staff and students.
  • Access to the tennis courts is from the south gates.
  • Access to soccer field is routed via the walkway south and west of the tennis courts. This route will continue for the duration of the MSA project.
  • Parking spaces/stalls on campus drive adjacent to the MSA project site are closed to staff and students.
  • Tree demolition will be taking place throughout the campus (majority of work will be in and around parking lots). While this operation is taking place a few parking stalls will be closed down from time to time. Full safety measures will be exercised for this operation.

Week of April 11th

Parking, ADA Access & Lighting Improvements (PAL)

Campus wide (majority of work in and around parking lots)

  • Tree demolition
  • Clear & grub

Lot A – Parking Lot A

  • Sack and patch flatwork
  • Landscape installation
  • Handrail installation
  • Clean-up
  • Punch list

Lot B – Parking Lot B

  • Asphalt paving
  • Form and pour flatwork
  • Landscape installation

Math and Science Annex (MSA)

  • Form and pour concrete for footings and foundations for modular classrooms
  • Modular building fabrication

Week of April 18th

Parking, ADA Access & Lighting Improvements (PAL)

Campus wide (majority of work in and around parking lots)

  • Tree demolition
  • Clear & grub

Lot A – Parking Lot A

  • Clean-up
  • Punch list
  • Temporary lighting set-up/installation
  • TENATIVE DATE FOR PARKING LOT A TURNOVER

Lot B – Parking Lot B

  • Asphalt paving
  • Striping
  • Form & pour and sack & patch flatwork
  • Landscape installation
  • Handrail installation

Math and Science Annex (MSA)

  • Strip forms and backfill around footings and foundations for modular classrooms
  • Modular building fabrication