We will make every effort to assure the accuracy and completeness of these updates; however, there will be some changes and adjustments as construction progresses.

How will Construction Activity Affect You?

  • Construction personnel and equipment will be on campus drive periodically throughout construction. Please proceed with caution.
  • With construction activity on-going safety is always a major priority for both staff and students. With this in mind we wanted to again ensure that both staff and students remain outside of the construction activity areas that have been established. These areas are clearly donated with temporary fencing. If access is needed within any construction areas proper notification, escort and safety measures (hard hats, vests, etc.) are required.
  • Campus Drive open.
  • Parking lots open: CDC, A1, A, B, C, D, E, F, G, gym lot H, I, Aquatic Center, and overflow.
  • In-wall exterior lights will be installed on stairs leading out of and in to parking lot E early next week. The stairs will be open and available for use.
  • Parking stalls in the northern section of the Aquatic Center parking lot will be closed for the duration of the LEED Solar Heating Panels project.

Week of January 30th

Parking, ADA Access & Lighting Improvements (PAL)

Lot E – Parking Lot E

  • In-wall exterior light installation on stairs
  • Punch list work

Solar Farm

  • Pre-fabrication

Aquatic Center LEED Solar Heating Panels

  • Grading for concrete pad on hillside north of parking lot
  • Potholing for utilities
  • Trenching for utilities within parking lot

Learning Resource Center

  • Access control / card reader installation
  • Minor patch & repair

Week of February 6th

Parking, ADA Access & Lighting Improvements (PAL)

Lot E – Parking Lot E

  • Punch list work

Solar Farm

  • Pre-fabrication

Aquatic Center LEED Solar Heating Panels

  • Forming for concrete pad on hillside north of parking lot
  • Potholing for utilities
  • Trenching for utilities within parking lot

Learning Resource Center

  • No work scheduled